More
More Download PDF
The largest district heating biomass project in the South East, based around an 840kW Binder boiler system. The biomass element with gas-fired boiler back-up, will service around 220 homes and apartments for a development close to Redhill railway station.
A 93kW Binder wood chip and pellet boiler supplies heat and hot water for all of the houses via a pre-insulated heat main in a minidistrict heating system.
The Earth Heart Housing Co-operative was established in 1997 with an aim to create a sustainable community for eight households. The community is based at Atlow Moat which is a Grade II Listed former farm complex in a remote setting. The development was undertaken to high environmental standards which included the provision of heat and hot water from a single biomass boiler.
Wood Energy Ltd, Registered in England and Wales, Company No. 04269709 Registered address: Wood Energy Ltd, Pinkworthy Barn, Oakford, Tiverton, Devon EX16 9EU Tel: +44 (0) 845 070 7338, Fax: +44 (0) 845 070 7339